Blue Chip Solar and Wind provides
construction supervision and arranges all subcontractor agreements. Our
management team has over 3,000 turbine installations of direct and/or
oversight experience at sites ranging from desert floors to mountain
ridgelines. These installations have included high voltage transmission
lines and substations, wind turbines and all related wind power
facility infrastructure.  The voltage levels are typically as
follows: Wind
turbine: 480V, three phase Wind
farm ring main: 11kv, three phase Local grid: 33k or 132 kV, three phase
Main grid
distribution system: 132, 275 or 400kV, three phase Secondary transmission system: 33, 66
or 132kV, three phase Primary
distribution system: 3.3, 6.6, 11 or 33kV, three phase Local distribution system: 415 three
phase or 240V single phase
Permits and Approvals Blue Chip Solar and Wind obtains all permits
and approvals necessary for the construction, interconnection and
operation of your projects, achieves site control, performs all
preliminary facility design, Engineering, Procurement and Construction
(EPC) contract and negotiates the turbine supply agreement.
|